Install additional power for aircraft maintenance training that includes 120 volt power, and 400 HZ power. Existing equipment was relocated without undue delay in operation. Project was completed before allocated time was reached, and without disruption to existing schedules.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Work with GC as a subcontractor to finish a new location for Advance Auto Parts Store in a very short time schedule. Even with a rain delay of 10 days construction was finished on time.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
install and changed signage on the airfield of SAFB. new locations, and changes to signage
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Marvin Groves Electric was recently awarded a contract for an electrical distribution system upgrade - design, short circuit and coordination study for the entire facility. This project will also evaluate the electrical system (both overhead and interior) for code compliance. After completion of the...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install power and communications for Midwestern State University on campus, and finish call box installations for contractor that was unable to perform contractual duties for other installation. Work includes approximately one mile of ditching and conduit installation, and running conduit unde...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
change out a pole mounted transformers to a pad mount transformer and add new duct bank system
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Sheppard AFB needed data/comm lines installed in a very short time frame. The new comm lines were to be extended to new equipment. the work consisted of some new duct bank, and pulling data fiber and copper lines in existing duct bank for a one mile length of comm lines. All work w...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install new communications to Midwestern State University for new dorms. Work consisted of approximately 700 data outlets for voice and data for new dorm structures. Communications had to be routed in tunnel system to new ductbank that had to cross existing parking lot to new site for dorm are...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Along with our subcontractor we demolished a 600 man dorm, 3 storm building to make room for future expansion at SAFB
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Disconnect building utilities, disconnect modular units, remove facility, remove concrete structures, and reseed area. all work performed in a three week time frame.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Remodel and relocate all wiring for power and communication needs for flight wing. The duty desk was relocated to another area, and the whole room was taken out of commission and reworked with new desk, updated wiring, and new communications with little disruption to flight wing oporation.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
perform many electrical projects as a sub contractor for the VA Medical system in the Central Texas Hospital District
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Change Two compressors on a chiller unit in one day for the FAA system in Beaumont, Tx
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install Emergency Generator and automatic transfer switch for emergency response fire station.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
We provided 23 tower speaker systems for teh early warning system for SAFB. this provids early warrnings for weather, announcements, and dailey messages to the personnel of SAFB
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
We provided early warrning system for Altus AFB by providing 12 Solar powered speaker towers.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
We were asked to replace all of the branch feeders for the branch panels for the entire school facility. Water had entered the basement electrical room and all of the electrical feeders and some of the electrical panels had to be replaced.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Remodel locker rooms, restrooms, and natatorium for local college in Vernon, TX.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Worked as subcontractor with GC in remodeling of Med Team Area for SAFB. Consist of office area, and training sites with power, lighting, and communication wiring.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Update gate controls, and security needs for munitions area.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install a PA system for the 80th flying training wing which includes NATO pilots training in a 200,000 sq ft building
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Remove 6\" of pea gravel and install compact fill and resurface play area with a rubberized material for child fall protection. This project was released to other contractors, but they could not bring within the government estimate.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
A new tower was installed for Wichita Falls. MGE was the electrical subcontractor for the project, with Daviid Ross Co. being the general contractor for Raytheon.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Replace door oporator for hanger door on x-ray hanger, and all controls
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Replace sod and top soil in about 400 locations to repair erosion areas along side of runway and taxi ways. We maintained constant contact with air control tower and security personnel.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Replace and update nurse call system in the Sheppard AFB Hospital with small amount of disruption to facility. Most work was performed at night time hours. A stop work order was issued due to the next area is to be remodeled and the nurse call would have to be taken out of oporation, as the ne...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Replace and relocate runway directional signs
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Remove and replace 10-RV Pedistals at a recreational area. All work completed in one week.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Make changes to the computer circuitry and add panels for emergency power for communication system
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
provide electrical sub contract for Reserve center Remodel with one of our General Contractor relationships
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
SABER
|
|
Location: Sheppard AFB |
|
|
|
We are currently providing the electrical subcontract for the SABER program for Sheppard AFB. Although this project is just using the electrical division of our company we are providing other scopes as needed.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Make an accounting of all fire alarm devices in the hospital at Sheppard Air Force Base, a 5 story facility. Install new head end equipment, and account for all devices and correct room numbers and locations after multiple remodels of the hospital.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install new blocks for gates to control water level and install new cathodic protection to gates. 20 week lead time for blocks with installation of 30 days for blocks and cathodic protection.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
MGE was selected to install 9 100 ft light poles for the security lighting for the training ramp area for SAFB. The lighting is for the security of the training aircraft for SAFB.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install 9-100 ft poles and light fixtures for the training ramp. Remove concrete slab at training ramp and install 16\' piers 4\' in diameter, for the pole bases.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
The project was to install new roof top a/c units, and all new lighting over the summer months while school was not in session. the Architect firm of Harper Perkins and the school system acting as project manager was very good to work with. work on the roof started one month before schoo...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
MGE was one of the sub contractors selected to work with the Secord, Lebow Architects, CR Reynolds GC. the schedule was to be keep the bank open and work in a very confined space until the building could be moved into, then demo the existing building for the new parking lot.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
provides maintenace and security lighting for 3 additional rows of hangers
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
We were selected to install the maintenance lighting and the security lighting for the air craft canopies to provide protection from the elements to the aircraft
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install temperature controls in 15 buildings, and update power to chillers and air handling equipment. All buildings were able to remain in operation so that clients would not have to be relocated.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install circuits for ups systems for computer information systems in 12 buildings. All work was completed in two weeks. This could have been performed in one week, but the Thanksgiving break was in the middle of this project.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
MGE has been selected as one of the contractors for material management and delivery for building materials for the Border Fence project along the border with Mexico. Materials as steel tubing, welding rods, cutting torch supplies, barbed wire. Some materials have been asked for pri...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
New addition, and remodle to VA Hospital for emergency services
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Electrical service for the Wichita Falls High School service buss duct failed, MGE was called to install new switchgear and replace the 2000 amp electrical service to the building.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Increase size of electrical service to the water booster station at SAFB and add additional switch gear to facility to handle and increasing load from updated equipment.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
MGE was contacted for the replacement of the warning beacon replacement atop the water tower for SAFB. The tower is the third highest tower west of the Mississippi river. A crain had to be brought in from Oklahoma City to reach the top of the tower and set the 700 lbs light fixture. ...
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Change three electrical seervices to Three schools in the WFISD during one summer with the help of a sub contractor the three were accomplished within the time frame and no school days were lost
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Remodel wing safety area to meet new needs for safety concerns for SAFB.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Make roofing and interior repairs at Municipal Airport after storm damage
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
installed over one mile of underground 15Kv power to ptovide an additional power feed to one of the flight training area to SAFB
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Provide and install advance electrical meters that will provide reading capabilities for reading other utilities other than electrical power
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Power Pro Building 2012 was a complete remodle. We were the acting GC on the project that included: concrete, metel stud, dry wall, grid ceiling, tape, bed, texture, paint, canopies, electrical, mechanical work. Total project $868,000.00
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|
|
|
|
|
Install conduit, and control wiring for substation and transformers for substation switches.
|
more...
|
| . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
|
|